Athletic Field Construction | Construction Renovations

Screenshot_57.png
web icon: 570 Huntly Industrial Drive Smyrna, TN 37167
web icon: 615-459-6993
web icon: email
web icon:
WAC is totally rebuilding the baseball field which was decimated by the tornado. Both dugouts have been rebuilt, over 1.5 million pounds of top soil has been brought in to put the baseball field back. Irrigation has been installed, and the backstop walls, poles, nets, foul poles, etc. are being replaced
Add Your Review